The permit is the beginning; inspections are how it ends. Every permitted project passes through a sequence of inspections where a municipal inspector verifies that the work matches the approved plans and the code. Pass them in order and the permit closes with a final; fail them and the project stops until the correction is made and the inspector returns. Here is the sequence, what inspectors look for, and how good contractors pass on the first visit.

The Sequence

Projects move through inspections that track construction stages. For new construction and additions: foundation and footings before concrete is poured, slab, framing and sheathing, roof dry-in, then the rough trades. For remodels: rough electrical, plumbing, and mechanical while walls are open; insulation; then finals. Trade permits carry their own inspections, such as a dry-in inspection on a reroof or a pressure test on a gas line. Nothing gets covered up until the inspection of what is underneath has passed; that rule drives the whole schedule.

What Inspectors Actually Check

Inspectors verify three things: that the work matches the approved plans, that it meets code, and that it uses approved products where required. In South Florida that last point carries weight: windows, doors, roofing, and structural connectors must match the product approvals in the permit file, and inspectors look for the labels. They also check the basics people forget, such as the permit card and approved plans being on site, the address visible, and the work accessible.

Why Jobs Fail the First Inspection

The common reasons are mundane: plans not on site; work covered before inspection; substitutions that do not match approvals; incomplete work when the inspector arrives; access problems; and details that differ from the drawings without an approved revision. Technical failures, such as wrong nailing patterns, missing straps, or improper clearances, happen too, but paperwork and sequencing failures are more frequent and entirely avoidable.

How Good Contractors Pass

They schedule inspections only when the work is complete and matches the plans. They keep the permit package on site. They walk the work before the inspector does, checking the items known to be scrutinized. They coordinate trades so the electrician’s rough is done when the plumber’s is, allowing one combined visit. And they treat inspectors as colleagues verifying the work rather than adversaries to be managed.

The Homeowner’s Role

For most projects, the contractor handles scheduling. The homeowner’s job is to ensure access and to understand that an inspection on the calendar can shift the schedule by days. If you are an owner-builder, the full responsibility is yours, including knowing which inspections your permit requires; the permit card lists them.

Finals and Closing the Permit

The final inspection confirms the completed project, and passing it closes the permit. This is the step most often skipped on projects that stall or run out of enthusiasm, and the skipped final becomes an open permit that surfaces at the sale of the home. Finish the sequence; the paperwork is the proof the project exists.